Michael and I headed to the chiro
first thing Tuesday morning (4/21). I
have been having a lot of problems with my right hip, and I’m sure it’s caused
by my limping due to left knee pain….and Dr Broyles confirmed that. So, I’m going to try to commit to visiting
twice a week to try to get back into alignment.
I was finally in my studio at 11 AM to wind bobbins and kick off
quilting on my newest quilt, which I’m going to call Diane’s “X”s….look at this
picture and see if you can figure out why (and know that this fabric came from
a former SHQ member, Dinae H.:
I hope it would have made her happy to know that her fabric is being used. I have 2 of these quilts, but didn’t have
enough backing to load both at once, so one at a time it is. I spent all afternoon (at least until 3 PM)
quilting and cleaning up my sewing room.
I’ve lost 2 of my box lids, which have 2 long term in-process quilt
pieces cut and I still can’t find them anywhere.
Anyway, at 3 PM I headed upstairs to bake 2
loaves of banana bread:
Michael was
originally supposed to get together with his LLB group for breakfast today, and
I planned to send banana bread. By the
time they decided it was going to be too cold in the morning, and switched it
to a dinner meeting, I already had the bananas thawed. Everyone is going to sit in the driveway, 6 feet
apart, and have pizzas, with banana bread for dessert! I baked a pan of brownies while the oven was
on as well.
Michael left for his dinner,
and I headed downstairs to make the last quilting pass on my quilt….something
was wrong and I shut down the stitching.
Luckily, BG called me just then, and we had a delightful time SKYPE’ing
for over an hour. After that I ripped
out stitches for 1-1/2 hours, and then shut everything down. I will figure out what went wrong Wednesday morning
:~).
Thanks for the banana bread and sorry for your ripping out problem!!
ReplyDelete